krit.club logo

Direct and Inverse Proportions

Each subtopic includes About section, revision page link, 10 preview questions, and practice CTAs.

Concept and Problems of Direct Proportion

Subtopic

Concept and Problems of Direct Proportion under Direct and Inverse Proportions for Grade 8 ICSE.

About Topic & Revision

Preview questions (no answers)

  1. 1.

    Which of the following mathematical statements correctly represents the condition for two quantities xx and yy to be in direct proportion (where kk is a constant)?

    A.

    x×y=kx \times y = k

    B.

    x+y=kx + y = k

    C.

    xy=kx - y = k

    D.

    xy=k\frac{x}{y} = k

  2. 2.

    If the cost of 1515 kg of sugar is ₹600600, what is the cost of 88 kg of sugar?

    A.

    320320

    B.

    400400

    C.

    300300

    D.

    280280

  3. 3.

    On a map, a scale of 11 cm represents 5050 km. If the distance between two cities on the map is 4.54.5 cm, what is the actual distance between them?

    A.

    200200 km

    B.

    225225 km

    C.

    450450 km

    D.

    11.111.1 km

Download the worksheet for Direct and Inverse Proportions - Concept and Problems of Direct Proportion to practice offline. It includes additional chapter-level practice questions.

Concept and Problems of Inverse Proportion

Subtopic

Concept and Problems of Inverse Proportion under Direct and Inverse Proportions for Grade 8 ICSE.

About Topic & Revision

Preview questions (no answers)

  1. 1.

    If 66 men can construct a shed in 44 days, how many days will it take 88 men to construct the same shed?

    A.

    55 days

    B.

    22 days

    C.

    33 days

    D.

    3.53.5 days

  2. 2.

    4040 men can finish a job in 2626 days. How many men are required to finish the same job in 2020 days?

    A.

    3131 men

    B.

    5252 men

    C.

    6060 men

    D.

    4848 men

  3. 3.

    1212 pipes can fill a tank in 22 hours. How long will it take 33 pipes to fill the same tank?

    A.

    0.50.5 hours

    B.

    66 hours

    C.

    88 hours

    D.

    44 hours

Download the worksheet for Direct and Inverse Proportions - Concept and Problems of Inverse Proportion to practice offline. It includes additional chapter-level practice questions.

Time and Work Problems

Subtopic

Time and Work Problems under Direct and Inverse Proportions for Grade 8 ICSE.

About Topic & Revision

Preview questions (no answers)

  1. 1.

    If 1010 oranges cost ₹8080, what is the cost of 11 dozen oranges?

    A.

    ₹90

    B.

    ₹100

    C.

    ₹96

    D.

    ₹84

  2. 2.

    If 1414 men can dig a trench in 66 days, how many men can dig it in 44 days?

    A.

    20

    B.

    22

    C.

    21

    D.

    24

  3. 3.

    In a model of a ship, the mast is 99 cm high, while the mast of the actual ship is 1212 m high. If the length of the ship is 2828 m, how long is the model ship?

    A.

    20 cm

    B.

    21 cm

    C.

    24 cm

    D.

    18 cm

Download the worksheet for Direct and Inverse Proportions - Time and Work Problems to practice offline. It includes additional chapter-level practice questions.

Direct and Inverse Proportions - Class 8 Maths (ICSE) | Krit.club